Regulatory

TPL AMGEN Fly Ash Stock

TPL AMGEN Fly Ash Stock

Name of the Power Utility: Torrent Power Limited

Name of the Thermal Power Plant ( Capacity in MW) : Sabarmati Thermal Power Station (422 MW)

Details of ash utilization during the Month of April 2018
Sl. No.Name of Ash Disposal AreaAsh disposal area in HectareDesign Life of Ash disposal areaPond Ash Availability in MT (up to 31.03.2018)Ash Generated in MT during the April- 2018Ash Utilized in MT during April-2018Pond Ash Availability in MT( up to 30.04.2018)
ESP Fly AshBottom AshDry ESP Fly AshBottom AshPond Ash
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
1  Motera gam 31.627  Periodically pond ash is evacuated to reclaim disposal area 10,23,401 24,274 6,068 22,255 - 8,431 10,23,057
2                    
3                    
ASH UTILIZATION DETAILS
Sl. No.Area of UtilizationFor the Month (April 2018)Ash utilized in MTCumulative for Year (FY 18-19) Ash Utilized in MT
Dry ESP Fly AshBottom AshPond AshDry ESP Fly AshBottom AshPond Ash
1 Bricks/Blocks/Tiles industries - - - - -
1A Dry ESP Fly Ash Issued to Bricks/Blocks/Tiles industries (Outside)            
1B Pond Ash Issued to Bricks/Blocks/Tiles industries (Outside)            
1C Fly Ash issued for Bricks/Blocks/Tiles in Own Plant - - - - -
a) Dry ESP Fly Ash issued            
b) Pond ash issued            
Sub-Total            
  Total fly ash Issued to Bricks/Block/Tile Industries (1A+1B+1C)  - - - - - -
2 Cement Industries            
2A Dry ESP Fly Ash Issued to Cement Industries            
a) Cement 22,255      22,255     
b) RMC            
c) Asbestos            
Sub-Total 22,255      22,255     
2B Pond Ash Issued to Cement Industries      0    
  Total Fly Ash Issued to Cement Industries (2A+2B) 22,255   0 22,255
3 Roads, Fly over /Rail Embankment - - - - -
3A Dry ESP Fly Ash Issued for Road construction (Outside)            
3B Pond Ash Issued for Road construction (Outside)            
  Total Fly Ash Issued for Road Construction (3A+3B)            
4 Total Fly Ash issued for Part replacement of cement in concrete            
5 Total Fly ash supplied to Hydro power sector            
6 Total Fly ash used for Ash Dyke raising            
7 Landfill/Reclaimation of low lying area            
a) Power Utility Own Land - - - - -
b)Outside Land     8,431      8,431
Total Fly Ash used for Landfill/Reclaimation of low lying area - 8,431 - - 8,431
8 Mine filling - - - - -
a) Open cast mine            
b) U.G.Mine            
Total Fly Ash used for Mine filling            
9 Agriculture / waste land development            
9A Dry ESP Fly Ash Issued for Agriculture / waste land development            
9B Pond Ash Issued for Agriculture / waste land development            
  Total Fly Ash Issued to Agriculture/ waste land development (9A+9B)            
10 Others            
a) CLSM            
b) Cenospheres            
c) Bottom ash cover            
d) Any other            
Total Fly Ash Issued for other purpose            
Grand Total 22,255 - 8,431 22,255 - 8,431
 

Bottom ash -collected from the bottom of furnace

Dry ESP Fly Ash - Collected from ESP and stored in Silo

Pond Ash - Fly ash and bottom ash Stored in Pond

CLSM - Controlled Low strength Material