Tariff of SUGEN Mega Power Plant (1147.5 MW) of Torrent Power Ltd approved by Hon’ble CERC for the period from 01.04.2014 to 31.03.2019
Tariff of UNOSUGEN Power Plant (382.5 MW) of Torrent Power Limited approved by Hon’ble CERC for the period from 01.04.2014 to 31.03.2019
Tariff application before Hon'ble CERC for determination of Generation Tariff of 1200 MW Dgen Mega Power Project covering the period COD of First Block to 31st March 2019